Phillip Creek Compressor Station Interconnectors

Type of project: Gas Infrastructure

Client: Jemena
Location: Warumungu, NT, Australia
Completed in: 2019

Spiecapag constructed the interconnectors required to complete the final tie-in works at the Phillip Creek Compressor Station. The scope included installation of the 100m interconnect line from the compressor to the APA Amadeus Gas Pipeline (AGP) and 150m interconnect line to the newly installed Northern Gas Pipeline (NGP). The scope also included above-ground pipework and the fabrication of pipe storage racks.