Snowy 2.0 Longitudinal Drainage Bores Project
Type of project: Renewable Energy infrastructure
Client: Future Generation Joint Venture (FGJV)
Location: Kiandra, New South Wales, Australia
Estimated Completion Date: 2026
Spiecapag Australia has been contracted by Future Generation Joint Venture (FGJV) to deliver the design and drilling of 2 drainage holes, each approximately 1,800 metres in length, as part of the Snowy 2.0 project, a large‑scale pumped hydro energy storage project in New South Wales. The work will be delivered by HDI Lucas, Spiecapag’s HDD team.
“Our HDD expertise will help overcome the complex geological challenges of the Snowy Mountains region and support the delivery of Australia’s largest renewable energy project” says John Walsh, Managing Director at Spiecapag. “Spiecapag is proud to contribute to the Snowy 2.0 project, which will play a vital role in Australia’s clean energy transition.”
Overview of Snowy Hydro 2.0